East Baghdad Field
East Baghdad field Laying two gas and crude oil pipelines, diameter 16 inches, 52 km, with the Chinese company Norinco.…
KAR GROUP ERBIL REFINERY 4th PHASE LPG TANKS
KAR GROUP ERBIL REFINERY 4th PHASE LPG TANKS Erbil-Iraq 2012
Project(1): FALLUJAH sewer/storm water collection system, main contractor with FLUOR AMEC,LLC ( 8,680,723 US $ ).
Project(2): Warehouse material handling and expanding warehouse area for BALADROOZ WTP, main contractor with FLUOR AMEC,LLC ( 1,205,660 US $ ).
Project(3): Warehouse shaded area and environment enclosure for BALADROOZ WTP, main contractor with FLUOR AMEC,LLC ( 215,158 US $ ).
Project(4): Material handling and site security for BALADROOZ WTP, main contractor with (GRD/PCO) ( 274,200 US $ ).
Project(5): Material handling and site security for BALADROOZ WTP, main contractor with (MMPW) ( 1,371,000 US $ ).
Project(6): BALADROOZ new WTP, Imam Askar Village, sub contractor with (MMPW) (718,000 US $).
Project(7): Potable Water Di Transmission pipe liens from BALADROOZ new WTP to Imam Mansour Village, sub contractor with (MMPW) (650,000 US $).
Project(8): Galvanized potable water storage tank in Baladrooz Town, sub contractor with (MMPW) (247,000 US $).
Project(9): Galvanized potable water storage tank in Imam Askar Village, sub contractor with (MMPW) (218,000 US $)
| ||||||||||||||||||||||||||||||||||||||||